The systematisation and industrialisation of construction requires the following processes, used by CompactHabit:

- Work in collaboration with the technical team that has drawn up the project, for maximum optimisation, so that the industrial processes can be carried out.
- Based on the final design, CompactHabit redraws and adapts the project to the industrial method and CompactHabit's own processes.
- After of the validation of the engineering project, CompactHabit initiates the management tasks of purchasing, storage and organisation of the start of production.
- Start of production. The work is organised in 5 basic areas:

  1. Production of the concrete module, where the reinforcement, modelling and concreting work is done.
  2. Assembly line. Area where the concrete modules move through the factory, at a rate of two per day.
  3. At the end of the assembly line a quality control and incident repair area is established.
  4. Once the quality control has been passed, the fully equipped module is prepared for storage and transport, ending with complete packaging.
  5. Storage of modules in the area outside the factory building, until it is time for transport and on-site assembly.